TaskThis project involved converting 10 miles of a 2 lane highway to 4 lanes. Work included the reconstruction of 7 bridges, including pile driving and 300,000 SY concrete paving with a soil cement and stone base. JB James crews also installed over 30,000 LF of storm drainage which included large diameter concrete pipe, precast concrete box culverts and inlets and cast in place inlets and manholes.